The equipment maintenance scheduling problem in a coal production system
Year of publication: |
2013
|
---|---|
Authors: | Jiu, Song ; Zhou, Zhili ; Liu, Jiyin |
Published in: |
International journal of production research. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 160477-6. - Vol. 51.2013, 17 (1.9.), p. 5309-5336
|
Subject: | equipment maintenance scheduling | coal production | mixed integer linear programming | hybrid genetic | Scheduling-Verfahren | Scheduling problem | Instandhaltung | Maintenance policy | Kohle | Coal | Kohlenbergbau | Coal mining | Mathematische Optimierung | Mathematical programming | Produktionsplanung | Production planning |
-
Chansombat, Sirikarn, (2019)
-
Mixed integer programming based maintenance scheduling for the Hunter Valley coal chain
Boland, Natashia, (2013)
-
Rail schedule optimisation in the Hunter Valley Coal Chain
Singh, Gaurav, (2015)
- More ...
-
The production scheduling problem in a multi-page invoice printing system
Zhang, Yan, (2010)
-
The equipment maintenance scheduling problem in a coal production system
Jiu, Song, (2013)
-
Liu, Jiyin, (2008)
- More ...