The multiproduct lot scheduling problem
| Year of publication: |
1981
|
|---|---|
| Authors: | Schrage, Linus |
| Published in: |
Working paper / European Institute for Advanced Studies in Management. - Brussels, ZDB-ID 863776-3. - 1981, 30, p. 1-14
|
| Subject: | Produktion Mehrproduktenfertigung | Betriebsfertigung | Scheduling-Verfahren | Scheduling problem | Mehrproduktfertigung | Multiproduct production | Theorie | Theory | Losgröße | Lot size | Produktionssteuerung | Production control |
-
An iterative procedure for the single-machine multi-product lot scheduling problem
Doll, C. Loren, (1973)
-
Soler, Willy A. O., (2021)
-
Meistering, Malte, (2017)
- More ...
-
Minimizing the time-in-system variance for a finite jobset
Schrage, Linus, (1975)
-
A proof of the optimality of the shortest remaining processing time discipline
Schrage, Linus, (1968)
-
Solving resource-constrained network problems by implicit enumeration-preemptive case
Schrage, Linus, (1972)
- More ...