The optimality box in uncertain data for minimising the sum of the weighted job completion times
Year of publication: |
1-15 October 2018
|
---|---|
Authors: | Lai, Tsung-Chyan ; Sotskov, Jurij Nazarovič ; Egorova, Natalja G. ; Werner, Frank |
Published in: |
International journal of production research. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 160477-6. - Vol. 56.2018, 19 (1/15.10.), p. 6336-6362
|
Subject: | scheduling | uncertainty | single-machine problem | uncertain durations | optimality box | Theorie | Theory | Scheduling-Verfahren | Scheduling problem | Risiko | Risk | Mathematische Optimierung | Mathematical programming |
-
Optimization with uncertainties : a scheduling example
Hegyháti, Máté, (2023)
-
Dynamic optimization of chemotherapy outpatient scheduling with uncertainty
Hahn-Goldberg, Shoshana, (2014)
-
Minimizing takeoff and landing risk in helicopter pickup and delivery operations
Gribkovskaia, Irina, (2015)
- More ...
-
Measures of problem uncertainty for scheduling with interval processing times
Sotskov, Jurij Nazarovič, (2013)
-
On the calculation of the stability radius of an optimal or an approximate schedule
Sotskov, Jurij Nazarovič, (1997)
-
Heuristics for permutation flow shop scheduling with batch setup times
Sotskov, Jurij Nazarovič, (1996)
- More ...