//-->
Heuristics for minimizing total weighted tardiness in complex job shops
Mason, S.J., (2005)
Optimal batching in a wafer fabrication facility using a multiproduct G-G-c model with batch processing
Fowler, J.W., (2002)
Run-to-run Control Charts with Contrasts
Runger, G.C., (1998)