Thermal performance evaluation of an energy and environmental research center building during winter
The building is constructed on a ground area of 3300 m2 and consists of five floors of total area of 6361 m2 with an air conditioned area of 3351 m2. The heating system comprises 1577 evacuated-tube collectors, two accumulation tanks of 15 m3 each, two thermal storage tanks of 150 m3 each, two auxiliary boilers of 443,000 kcal/h each, pumps, heat exchangers and control equipment. The thermal performance evaluation shows that the inside temperature was kept at the desired value (22°C) which demonstrates the system's ability to meet the building load. The performance also shows that the collection efficiency for the whole season was 50% and the collected and stored energy was higher than the required load which indicates that the solar fraction to the load was 100%.
Year of publication: |
2000
|
---|---|
Authors: | Al-Karaghouli, A. ; Abood, I. |
Published in: |
Applied Energy. - Elsevier, ISSN 0306-2619. - Vol. 65.2000, 1-4, p. 231-238
|
Publisher: |
Elsevier |
Saved in:
Saved in favorites
Similar items by person
-
A new approach for soil solarization by using paraffin-wax emulsion as a mulching material
Al-Kayssi, A.W., (2002)
-
Wind availability and its power utility for electricity production in Bahrain
Alnaser, W.E., (2000)
-
Al-Karaghouli, A., (2000)
- More ...