Threshold-based method for elevating the system's constraint under theory of constraints
| Year of publication: |
2010
|
|---|---|
| Authors: | Aryanezhad, M. B. ; Badri, S. A. ; Komijan, A. Rashidi |
| Published in: |
International journal of production research. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 160477-6. - Vol. 48.2010, 17/18 (1/15.9.), p. 5075-5087
|
| Subject: | Produktionssteuerung | Production control | Durchlaufzeit | Lead time | Produktionskapazität | Production capacity | Kapazitätsplanung | Capacity planning | Markov-Kette | Markov chain | Heuristik | Heuristics | Theorie | Theory |
-
A genetic algorithm to solve the production lot-sizing problem with capacity adjustment
Yang, Jinglei, (2024)
-
Material and capacity requirements planning with dynamic lead times
Jodlbauer, Herbert, (2012)
-
Capacity planning with limited information
Anand, Vic, (2023)
- More ...
-
Threshold-based method for elevating the system's constraint under theory of constraints
Aryanezhad, M. B., (2010)
-
A multi-objective set covering problem : a case study of warehouse allocation in truck industry
Malekinezhad, Atefeh, (2011)
-
Fallah, Mohammad, (2011)
- More ...