Time and space multi-manned assembly line balancing problem using genetic algorithm
Year of publication: |
2021
|
---|---|
Authors: | Zamzam, Nessren ; Elakkad, Ahmed |
Published in: |
Journal of industrial engineering and management : JIEM. - Terrassa : Universitat Politècnica de Catalunya (UPC), ISSN 2013-0953, ZDB-ID 2495074-9. - Vol. 14.2021, 4, p. 733-749
|
Subject: | Assembly line | genetic algorithm | multi-manned | time and space assembly line | Evolutionärer Algorithmus | Evolutionary algorithm | Fließfertigung | Assembly-line production | Theorie | Theory | Scheduling-Verfahren | Scheduling problem |
Type of publication: | Article |
---|---|
Type of publication (narrower categories): | Aufsatz in Zeitschrift ; Article in journal |
Language: | English |
Other identifiers: | 10.3926/jiem.3542 [DOI] hdl:10419/261777 [Handle] |
Source: | ECONIS - Online Catalogue of the ZBW |
-
Mathematical analysis and solutions for multi-objective line-cell conversion problem
Yu, Yang, (2014)
-
Sustainable operator assignment in an assebly line using genetic algorithm
Zaman, Tanzina, (2012)
-
Zhu, Guang-Yu, (2018)
- More ...
-
Time and space multi-manned assembly line balancing problem using genetic algorithm
Zamzam, Nessren, (2021)
- More ...