Two-agent scheduling on a single parallel-batching machine with equal processing time and non-identical job sizes
| Year of publication: |
16 April 2017
|
|---|---|
| Authors: | Wang, Jun-Qiang ; Fan, Guo-Qiang ; Zhang, Yingqian ; Zhang, Cheng-Wu ; Leung, Joseph Y-T. |
| Published in: |
European journal of operational research : EJOR. - Amsterdam : Elsevier, ISSN 0377-2217, ZDB-ID 243003-4. - Vol. 258.2017, 2 (16.4.), p. 478-490
|
| Subject: | Scheduling | Heuristics | Parallel-batching machine | Two-agent scheduling | NP-hardness | Scheduling-Verfahren | Scheduling problem | Theorie | Theory | Heuristik | Durchlaufzeit | Lead time | Produktionssteuerung | Production control |
-
Single machine scheduling to maximize the number of on-time jobs with generalized due-dates
Gerstl, Enrique, (2020)
-
Two-machine flowshop scheduling with three-operation jobs subject to a fixed job sequence
Lin, Bertrand M. T., (2017)
-
Minimizing energy consumption and makespan in a two-machine flowshop scheduling problem
Mansouri, S. Afshin, (2016)
- More ...
-
Chen, Rong, (2017)
-
Robust scheduling on a single machine usinge time buffers
Briskorn, Dirk, (2008)
-
Inventory constrained scheduling on a single machine
Briskorn, Dirk, (2008)
- More ...