Two-machine flow shop scheduling of polyurethane foam production
Year of publication: |
2013
|
---|---|
Authors: | Lin, Bertrand M.T. ; Lin, Y.-Y. ; Fang, K.-T. |
Published in: |
International Journal of Production Economics. - Elsevier, ISSN 0925-5273. - Vol. 141.2013, 1, p. 286-294
|
Publisher: |
Elsevier |
Subject: | Polyurethane foam | Flow shop | Precedence constraints | Branch-and-bound algorithm | Heuristic | Iterative local search |
-
MAKESPAN MINIMIZATION ON THREE-MACHINE FLOW SHOP WITH DETERIORATING JOBS
WANG, JI-BO, (2013)
-
Sun, Xinyu, (2021)
-
Two-machine flow shop scheduling with deteriorating jobs and chain precedence constraints
Zhao, Chuanli, (2012)
- More ...
-
Two-machine flow shop scheduling of polyurethane foam production
Lin, Bertrand M.T., (2013)
-
EFFICIENCY OF LINEAR ESTIMATORS UNDER HEAVY-TAILEDNESS: CONVOLUTIONS OF α-SYMMETRIC DISTRIBUTIONS
Ibragimov, Rustam, (2007)
-
Two-machine flow shop scheduling of polyurethane foam production
Lin, Bertrand M. T., (2013)
- More ...