Two-machine openshop scheduling with an availability constraint
Year of publication: |
2000
|
---|---|
Authors: | Breit, Joachim ; Schmidt, Günter |
Publisher: |
Saarbrücken : Univ. of Saarbrücken |
Extent: | 20 Bl. : graph. Darst. |
---|---|
Series: | Discussion papers / Department of Economics, University of Saarland / B, [englische Reihe]. - Saarbrücken. - Vol. 2001 |
Type of publication: | Book / Working Paper |
Language: | English |
Classification: | Fertigung |
Source: |
-
Produktcontrolling in der Automobilindustrie
Kemminer, Jörg, (1998)
-
Industrial production structures and convergence : some findings from European integration
Löhnig, Claudia, (1998)
-
Stewart, M. G., (1998)
- More ...
-
Two-machine open shop scheduling with an availability constraint
Breit, Joachim, (2000)
-
Non-preemptive two-machine open shop scheduling with non-availability constraints
Breit, Joachim, (2001)
-
Deterministic machine scheduling with limited machine availability
Braun, Oliver, (2004)
- More ...