Two-parallel machines scheduling with rate-modifying activities to minimize total completion time
| Year of publication: |
2009
|
|---|---|
| Authors: | Zhao, Chuan-li ; Tang, Heng-yong ; Cheng, Cong-dian |
| Published in: |
European journal of operational research : EJOR. - Amsterdam : Elsevier, ISSN 0377-2217, ZDB-ID 243003-4. - Vol. 198.2009, 1 (1.10.), p. 354-357
|
| Subject: | Scheduling-Verfahren | Scheduling problem | Durchlaufzeit | Lead time | Theorie | Theory | Algorithmus | Algorithm | Heuristik | Heuristics | Produktionssteuerung | Production control |
-
Corominas, Albert, (2019)
-
Ozturk, Onur, (2017)
-
Single machine scheduling problems with generalised due-dates and job-rejection
Gerstl, Enrique, (2017)
- More ...
-
Two-parallel machines scheduling with rate-modifying activities to minimize total completion time
Zhao, Chuan-Li, (2009)
-
Two-parallel machines scheduling with rate-modifying activities to minimize total completion time
Zhao, Chuan-Li, (2009)
-
Scheduling deteriorating jobs under disruption
Zhao, Chuan-Li, (2010)
- More ...