Two-stage time minimizing assignment problem
This paper deals with the optimal selection of m out of n facilities to first perform m given primary jobs in Stage-I followed by the remaining (n-m) facilities performing optimally the (n-m) secondary jobs in Stage-II. It is assumed that in both the stages facilities perform in parallel. The aim of the proposed study is to find that set of m facilities performing the primary jobs in Stage-I for which the sum of the overall completion times of jobs in Stage-I and the corresponding optimal completion time of the secondary jobs in Stage-II by the remaining (n-m) facilities is the minimum. The developed solution methodology involves solving the standard time minimizing and cost minimizing assignment problems alternately after forbidding some facility-job pairings and suggests a polynomially bound algorithm. This proposed algorithm has been implemented and tested on a variety of test problems and its performance is found to be quite satisfactory.
| Year of publication: |
2008
|
|---|---|
| Authors: | Sonia ; Puri, M.C. |
| Published in: |
Omega. - Elsevier, ISSN 0305-0483. - Vol. 36.2008, 5, p. 730-740
|
| Publisher: |
Elsevier |
| Keywords: | Combinatorial analysis Mathematical programming Non-linear programming Allocation |
Saved in:
Saved in favorites
Similar items by person
-
Two-stage time minimizing assignment problem
Sonia, (2008)
-
A variant of time minimizing assignment problem
Arora, Shalini, (1998)
-
Ranking in quadratic integer programming problems
Gupta, R., (1996)
- More ...