Using a genetic algorithm to schedule the space-constrained AGV-based prefabricated bathroom units manufacturing system
Year of publication: |
2019
|
---|---|
Authors: | Chen, Chen ; Tiong, Lee Kong ; Chen, I.-Ming |
Subject: | AGV-based manufacturing system | flow process | genetic algorithms | prefabricated bathroom unit | space-constrained scheduling | Evolutionärer Algorithmus | Evolutionary algorithm | Scheduling-Verfahren | Scheduling problem | Produktionssystem | Manufacturing system | Produktionssteuerung | Production control |
-
Huang, Jingying, (2020)
-
Heuristics and lower bounds for minimizing the total completion time in a two-machine flowshop
Ladhari, Talel, (2009)
-
Rakrouki, Mohamed Ali, (2012)
- More ...
-
Chen, Chen, (2019)
-
Chen, Wen, (2017)
-
Chen, Wen, (2017)
- More ...