//-->
The use of upstream and downstream information in scheduling semi-conductor batch operations
Robinson, J.K., (1995)
Sequencing mixed-model assembly lines to level parts usage and minimize line length
Bard, J.F., (1994)
PREFACE - BOOK REVIEWS - Practical Bilevel Optimization: Algorithms and Applications
Bard, J.F., (1999)