Worst-Case Analysis of Heuristic Algorithms for Two-Machine Open Shop Scheduling Problem with Route-Dependent Processing Times.
| Year of publication: |
1993
|
|---|---|
| Authors: | Strusevich, V.A. ; Waart, Van de ; Dekker, R. |
| Institutions: | Econometrisch Instituut, Faculteit der Economische Wetenschappen |
| Subject: | econometrics |
-
Do Bank Mergers Create Shareholder Value? An Event Study Analysis
Sharma, Varini, (2010)
-
Myopia of Health-Care Reform Using Business Models
Kenneth, MacInnes, (2001)
-
Reducing marketplace interference bias via shadow prices
Bright, Ido, (2025)
- More ...
-
A New Heuristic for Three-Machine Flow Shop Scheduling.
Chen, B., (1993)
-
Joint Replacement in an Operational Planning Phase.
Dekker, R., (1994)
-
Analysis of a 2-Phase Model for Optimization of Condition Monitoring Intervals.
Coolen, F.P.A., (1994)
- More ...