Remer, Donald S.; Kelly, Brian C.; Lim, Hwee Tong - In: Energy 8 (1983) 6, pp. 461-472
A feasibility study, design, and cost estimate have been completed for a 1 MWe photovoltaic (PV) facility which would float on an inland reservoir at Catalina Island. If built, this would be one of the largest PV operating facilities to date and also the first floating PV system. The modular...