EconBiz - Find Economic Literature
    • Logout
    • Change account settings
  • A-Z
  • Beta
  • About EconBiz
  • News
  • Thesaurus (STW)
  • Academic Skills
  • Help
  •  My account 
    • Logout
    • Change account settings
  • Login
EconBiz - Find Economic Literature
Publications Events
Search options
Advanced Search history
My EconBiz
Favorites Loans Reservations Fines
    You are here:
  • Home
  • Search: subject:"Level scheduling"
Narrow search

Narrow search

Year of publication
Subject
All
Scheduling 16 level scheduling 16 Scheduling-Verfahren 5 Theorie 5 Fließfertigung 4 Just in Time 4 Level Scheduling 4 Level scheduling 4 Logistik 4 Scheduling problem 4 Theory 4 logistics 4 Assembly-line production 3 Just in time 3 Just-in-time-Prinzip 3 Mixed-model assembly line 3 Mixed-model assembly lines 3 Sequencing 3 just in time 3 Algorithm 2 Algorithmus 2 Car Sequencing 2 Computational Results 2 Constraint Propagation Algorithms 2 Dynamic Programming 2 Dynamische Optimierung 2 Just-in-Time 2 Mathematisches Modell 2 Nonsmooth optimization 2 Optimierung 2 Prioritätsregel 2 Produktdifferenzierung 2 Produktionssteuerung 2 Reihenfolgeproblem 2 Aerospace Industry 1 Assembly line sequencing 1 Ausbringung 1 Batched part supply 1 Benders decomposition 1 Bi-level scheduling 1
more ... less ...
Online availability
All
Undetermined 9 Free 2
Type of publication
All
Book / Working Paper 22 Article 5
Type of publication (narrower categories)
All
Article in journal 3 Aufsatz in Zeitschrift 3 Working Paper 2 Arbeitspapier 1 Graue Literatur 1 Non-commercial literature 1
Language
All
English 23 Undetermined 4
Author
All
Boysen, Nils 17 Fliedner, Malte 15 Scholl, Armin 14 Bierwirth, Christian 2 Drexl, Andreas 2 Kimms, Alf 2 Krüger, Doreen 2 Mattfeld, Dirk C. 2 Allweyer, Thomas 1 Bock, Stefan 1 Emde, Simon 1 Kong, Min 1 Loos, Peter 1 Matthiessen, Lars 1 Matthießen, Lars 1 Mladenovic, Nenad 1 Pardalos, Panos M. 1 Pei, Jun 1 Pereira, Jordi 1 Pesch, Erwin 1 Polten, Lukas 1 Scheer, August-Wilhelm 1 Vilà, Mariona 1 Wang, Haoxin 1
more ... less ...
Institution
All
Universität <Jena> / Wirtschaftswissenschaftliche Fakultät 13 Wirtschaftswissenschaftliche Fakultät, Friedrich-Schiller-Universität Jena 6 Universität <Bremen> / Lehrstuhl für Logistik 1
Published in...
All
Friedrich-Schiller-Universität Jena - Wirtschaftswissenschaftliche Universität - Jena Research Papers 13 Jena Research Papers inBusiness and Economics 13 Jena Research Papers in Business and Economics - Working and Discussion Papers 5 International journal of production research 2 Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 2 Universität Bremen - Lehrstuhl für Logistik - Publikationen 2 Institut für Wirtschaftsinformatik (IWi) im Deutschen Forschungszentrum für Künstliche Intelligenz (DFKI GmbH), Universität des Saarlandes, Saarbrücken - Publikationen 1 Jenaer Schriften zur Wirtschaftswissenschaft 1 Journal of scheduling 1 Parmee, I.C. (Ed.), Proceedings of ACDM98, Springer-Verlag, Stuttgart 1998, pp. 59 - 67 1 Veröffentlichungen des Instituts für Wirtschaftsinformatik 1
more ... less ...
Source
All
USB Cologne (business full texts) 16 RePEc 6 ECONIS (ZBW) 4 EconStor 1
Showing 11 - 20 of 27
Cover Image
Level Scheduling for batched JIT supply
Boysen, Nils; Fliedner, Malte; Scholl, Armin - Wirtschaftswissenschaftliche Fakultät, … - 2009
Level Scheduling, which aims at distributing the part consumption induced by the model sequence evenly over time …. Traditional Level Scheduling seeks to closely approximate target demand rates at every production cycle, however, such a strict … consumption pattern between two delivery points seems irrelevant. The paper on hand provides new Level Scheduling models, proves …
Persistent link: https://www.econbiz.de/10005785957
Saved in:
Cover Image
Constraint propagation algorithms for the car sequencing problem
Matthießen, Lars; Drexl, Andreas; Kimms, Alf - 2000
feasible sequences are provided. Second, an algorithm is presented which can optimize a level scheduling objective while taking …
Persistent link: https://www.econbiz.de/10011558763
Saved in:
Cover Image
Constraint propagation algorithms for the car sequencing problem
Matthiessen, Lars; Drexl, Andreas; Kimms, Alf - 2000
feasible sequences are provided. Second, an algorithm is presented which can optimize a level scheduling objective while taking …
Persistent link: https://www.econbiz.de/10011734528
Saved in:
Cover Image
Solving symmetric mixed-model multileveljust-in-time scheduling problems
Fliedner, Malte; Boysen, Nils; Scholl, Armin - Universität <Jena> / Wirtschaftswissenschaftliche Fakultät - 2008
The generation of leveled production schedules is of high impor-tance for mixed-model assembly lines whose parts and materials are suppliedjust-in-time by multi-level production processes. The Output Rate Variatonproblem is the standard mathematical representation of this complex levelscheduling...
Persistent link: https://www.econbiz.de/10005870722
Saved in:
Cover Image
Scheduling freight trains inrail-rail transshipment yards
Boysen, Nils; Pesch, Erwin - Universität <Jena> / Wirtschaftswissenschaftliche Fakultät - 2008
Transshipment yards, where gantry cranes allow for an ecient transshipment of containersbetween different freight trains, are important entities in modern railway systems andfacilitate the general shift from point-to-point transport to hub-and-spoke railway systems.Modern rail-rail transshipment...
Persistent link: https://www.econbiz.de/10005870732
Saved in:
Cover Image
Scheduling Aircraft Landings toBalance Workload of Ground Staff
Fliedner, Malte; Boysen, Nils - Universität <Jena> / Wirtschaftswissenschaftliche Fakultät - 2008
Scheduling landings of aircrafts is an essential problem which is continuouslysolved as part of the daily operations of an airport control tower. All planesin the airspace of an airport are to be assigned to landing slots by the respon-sible air-trac controller. The support of this decision...
Persistent link: https://www.econbiz.de/10005870735
Saved in:
Cover Image
Managing and modelling generalresource transfersin (multi-)project scheduling
Krüger, Doreen; Scholl, Armin - Universität <Jena> / Wirtschaftswissenschaftliche Fakultät - 2008
Most approaches to multi-project scheduling are based on the assumption that resources can betransferred between projects without any expense in time and cost. As this assumption often isnot realistic, we generalise the multi-project scheduling problem (RCMPSP) by additionallyincluding transfer...
Persistent link: https://www.econbiz.de/10005870777
Saved in:
Cover Image
Solving symmetric mixed-model multi-level just-in-time scheduling problems
Fliedner, Malte; Boysen, Nils; Scholl, Armin - Wirtschaftswissenschaftliche Fakultät, … - 2008
mathematical representation of this complex level scheduling problem and has been extensively studied by research thus far. This …
Persistent link: https://www.econbiz.de/10005739709
Saved in:
Cover Image
Scheduling Inbound and OutboundTrucks at Cross Docking Terminals
Fliedner, Malte; Boysen, Nils; Scholl, Armin - Universität <Jena> / Wirtschaftswissenschaftliche Fakultät - 2007
At cross docking terminals, shipments from inbound trucks are unloaded,sorted and moved to dispatch points where they are directly loaded onto out-bound trucks for an immediate delivery elsewhere in the distribution system.This warehouse management concept aims at realizing economies in...
Persistent link: https://www.econbiz.de/10005870800
Saved in:
Cover Image
A heuristic solution framework for theresource constrained multi-projectscheduling problem withsequence-dependent transfer times
Krüger, Doreen; Scholl, Armin - Universität <Jena> / Wirtschaftswissenschaftliche Fakultät - 2007
We consider the problem of scheduling multiple projects subject to joint resource constraints.All approaches proposed in the literature so far are based on the assumption that resources canbe transferred from one project to the other without any expense in time or cost. In many realworldsettings...
Persistent link: https://www.econbiz.de/10005870801
Saved in:
  • First
  • Prev
  • 1
  • 2
  • 3
  • Next
  • Last
A service of the
zbw
  • Sitemap
  • Plain language
  • Accessibility
  • Contact us
  • Imprint
  • Privacy

Loading...