EconBiz - Find Economic Literature
    • Logout
    • Change account settings
  • A-Z
  • Beta
  • About EconBiz
  • News
  • Thesaurus (STW)
  • Academic Skills
  • Help
  •  My account 
    • Logout
    • Change account settings
  • Login
EconBiz - Find Economic Literature
Publications Events
Search options
Advanced Search history
My EconBiz
Favorites Loans Reservations Fines
    You are here:
  • Home
  • Search: subject:"Population-based heuristics"
Narrow search

Narrow search

Year of publication
Subject
All
Dynamic programming 2 Heuristics 2 Heuristik 2 Machine scheduling 2 Outsourcing 2 Pareto front 2 Population-based heuristics 2 Scheduling problem 2 Scheduling-Verfahren 2 Theorie 2 Theory 2 Uncertainty 2 Dynamische Optimierung 1 Evolutionary algorithm 1 Evolutionärer Algorithmus 1 Instandhaltung 1 Lieferkette 1 Maintenance policy 1 Risiko 1 Risk 1 Supply chain 1 combinatorial optimisation 1 evolutionary algorithms 1 labour 1 maintenance 1 meta-heuristics 1 personnel 1 planning 1 population-based heuristics 1 staffinf 1
more ... less ...
Online availability
All
Undetermined 1
Type of publication
All
Article 3
Type of publication (narrower categories)
All
Article in journal 2 Aufsatz in Zeitschrift 2 research-article 1
Language
All
English 3
Author
All
Chen, Haozhe 2 Liu, Feng 2 Lagodimos, Athanasios G. 1 Nearchou, Andreas C. 1 Wang, Jian-Jun 1 Wang, Jian-jun 1 Yang, De-Li 1 Yang, De-li 1
more ... less ...
Published in...
All
European journal of industrial engineering : EJIE 1 The International Journal of Logistics Management 1 The international journal of logistics management 1
Source
All
ECONIS (ZBW) 2 Other ZBW resources 1
Showing 1 - 3 of 3
Cover Image
Machine scheduling with outsourcing : Coping with supply chain uncertainty with a second supplying source
Liu, Feng; Wang, Jian-Jun; Chen, Haozhe; Yang, De-Li - In: The International Journal of Logistics Management 25 (2014) 1, pp. 133-159
Purpose – The purpose of this paper is to study the use of outsourcing as a mechanism to cope with supply chain uncertainty, more specifically, how to deal with sudden arrival of higher priority jobs that require immediate processing, in an in-house manufacturer's facility from the perspective...
Persistent link: https://www.econbiz.de/10014781465
Saved in:
Cover Image
Machine scheduling with outsourcing : coping with supply chain uncertainty with a second supplying source
Liu, Feng; Wang, Jian-jun; Chen, Haozhe; Yang, De-li - In: The international journal of logistics management 25 (2014) 1, pp. 133-159
Persistent link: https://www.econbiz.de/10010386415
Saved in:
Cover Image
Heuristic solutions for the economic manpower shift planning problem
Nearchou, Andreas C.; Lagodimos, Athanasios G. - In: European journal of industrial engineering : EJIE 7 (2013) 6, pp. 657-686
Persistent link: https://www.econbiz.de/10010404224
Saved in:
A service of the
zbw
  • Sitemap
  • Plain language
  • Accessibility
  • Contact us
  • Imprint
  • Privacy

Loading...