EconBiz - Find Economic Literature
    • Logout
    • Change account settings
  • A-Z
  • Beta
  • About EconBiz
  • News
  • Thesaurus (STW)
  • Academic Skills
  • Help
  •  My account 
    • Logout
    • Change account settings
  • Login
EconBiz - Find Economic Literature
Publications Events
Search options
Advanced Search history
My EconBiz
Favorites Loans Reservations Fines
    You are here:
  • Home
  • Search: subject:"linear scheduling"
Narrow search

Narrow search

Year of publication
Subject
All
linear scheduling 2 Construction scheduling 1 Earthworks planning 1 Expert Systems 1 High Rise Building Construction 1 Interval Time 1 Line-OF-BALANCE 1 Linear Scheduling Methods 1 Linear scheduling 1 Multistage Linear Scheduling 1 Networks 1 Repetitive Project 1 Scheduling 1 Two-stage profit optimization 1 cash flow 1 constraint programming 1 line of balance 1 linear scheduling problems 1 optimization 1 productivity 1 repetitive construction 1 sensitivity analysis 1 time location plan 1
more ... less ...
Online availability
All
Undetermined 6
Type of publication
All
Article 6
Language
All
Undetermined 6
Author
All
Arditi, David 2 Tokdemir, Onur 2 Balcik, Cenk 1 Bonnal, Pierre 1 Dawood, Nashwan 1 Gourc, Didier 1 Hameri, Ari-pekka 1 Huang, Yu-Chun 1 Lacoste, Germain 1 Liu, Shu-Shun 1 Shah, Raj Kapur 1 Sikangwan, Pirasak 1 Wang, Chang-Jung 1 Wang, Ching-Hwang 1
more ... less ...
Published in...
All
Construction Management and Economics 6
Source
All
RePEc 6
Showing 1 - 6 of 6
Cover Image
An innovative approach for generation of a time location plan in road construction projects
Shah, Raj Kapur; Dawood, Nashwan - In: Construction Management and Economics 29 (2011) 5, pp. 435-448
Existing linear scheduling methods for earthwork activities lack accurate scheduling locations in road construction …
Persistent link: https://www.econbiz.de/10009200299
Saved in:
Cover Image
Two-stage profit optimization model for linear scheduling problems considering cash flow
Liu, Shu-Shun; Wang, Chang-Jung - In: Construction Management and Economics 27 (2009) 11, pp. 1023-1037
model for linear scheduling problems using constraint programming (CP) is proposed. To maintain work continuity for … continuity for linear scheduling problems. …
Persistent link: https://www.econbiz.de/10008603281
Saved in:
Cover Image
ALISS: Advanced Linear Scheduling System
Tokdemir, Onur; Arditi, David; Balcik, Cenk - In: Construction Management and Economics 24 (2006) 12, pp. 1253-1267
problems associated with LOB applications. ALISS is an acronym for Advanced Linear Scheduling System and makes use of a model … utilises MS Access and SQL server as a data repository. The resulting Advanced Linear Scheduling System not only accommodates …
Persistent link: https://www.econbiz.de/10005445661
Saved in:
Cover Image
A linear-discrete scheduling model for the resource-constrained project scheduling problem
Bonnal, Pierre; Gourc, Didier; Hameri, Ari-pekka; … - In: Construction Management and Economics 23 (2005) 8, pp. 797-814
allow this, the linear scheduling problem is reformulated, so classical schedule calculation approaches can be used. The …
Persistent link: https://www.econbiz.de/10005482442
Saved in:
Cover Image
Scheduling system for high rise building construction
Arditi, David; Sikangwan, Pirasak; Tokdemir, Onur - In: Construction Management and Economics 20 (2002) 4, pp. 353-364
A computerized system to schedule high-rise building construction has been developed using line-of-balance technology assisted by an expert system. A review of the recent literature on the techniques available for scheduling and controlling construction projects of a repetitive nature shows that...
Persistent link: https://www.econbiz.de/10005633133
Saved in:
Cover Image
Controlling activity interval times in LOB scheduling
Wang, Ching-Hwang; Huang, Yu-Chun - In: Construction Management and Economics 16 (1998) 1, pp. 5-16
presents a new scheduling method, the multistage linear scheduling (MLS) method, based on the concept of a multistage decision …
Persistent link: https://www.econbiz.de/10005633169
Saved in:
A service of the
zbw
FAQ-Assistent (beta)
  • Sitemap
  • Plain language
  • Accessibility
  • Contact us
  • Imprint
  • Privacy

Loading...