EconBiz - Find Economic Literature
    • Logout
    • Change account settings
  • A-Z
  • Beta
  • About EconBiz
  • News
  • Thesaurus (STW)
  • Academic Skills
  • Help
  •  My account 
    • Logout
    • Change account settings
  • Login
EconBiz - Find Economic Literature
Publications Events
Search options
Advanced Search history
My EconBiz
Favorites Loans Reservations Fines
    You are here:
  • Home
  • Search: subject:"multi-mode RCPSP"
Narrow search

Narrow search

Year of publication
Subject
All
multi-mode RCPSP 3 project scheduling 3 Project scheduling SAT Multi-mode RCPSP 1 SAT 1 genetic algorithm 1 resource scarceness matrix 1 scatter search 1
more ... less ...
Online availability
All
Free 3 Undetermined 1
Type of publication
All
Book / Working Paper 3 Article 1
Language
All
English 3 Undetermined 1
Author
All
VANHOUCKE, M. 3 PETEGHEM, V. VAN 2 COELHO, J. 1 Coelho, José 1 Vanhoucke, Mario 1
Institution
All
Faculteit Economie en Bedrijfskunde, Universiteit Gent 3
Published in...
All
Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium 3 European Journal of Operational Research 1
Source
All
RePEc 4
Showing 1 - 4 of 4
Cover Image
Using Resource Scarceness Characteristics to Solve the Multi-Mode Resource-Constrained Project Scheduling Problem
PETEGHEM, V. VAN; VANHOUCKE, M. - Faculteit Economie en Bedrijfskunde, Universiteit Gent - 2009
In the past decades, resource parameters have been introduced in project scheduling literature to measure the scarceness of resources of a project instance. In this paper, we use these resource scarceness parameters to differentiate in the search process needed to solve the multi-mode resource...
Persistent link: https://www.econbiz.de/10005007707
Saved in:
Cover Image
Multi-mode resource constrained pro ject scheduling using RCPSP and SAT solvers
COELHO, J.; VANHOUCKE, M. - Faculteit Economie en Bedrijfskunde, Universiteit Gent - 2009
This paper reports on a new solution approach for the well-known multi-mode resource-constrained project scheduling problem (MMRCPSP). This problem type aims at the selection of a single activity mode from a set of available modes in order to construct a precedence and a (renewable and...
Persistent link: https://www.econbiz.de/10008468958
Saved in:
Cover Image
A Genetic Algorithm for the Multi-Mode Resource-Constrained Project Scheduling Problem
PETEGHEM, V. VAN; VANHOUCKE, M. - Faculteit Economie en Bedrijfskunde, Universiteit Gent - 2008
In this paper we present a genetic algorithm for the multi-mode resource-constrained project scheduling problem (MRCPSP), in which multiple execution modes are available for each of the activities of the project. In contrast to a conventional genetic algorithm, we apply a bi-population genetic...
Persistent link: https://www.econbiz.de/10004983014
Saved in:
Cover Image
Multi-mode resource-constrained project scheduling using RCPSP and SAT solvers
Coelho, José; Vanhoucke, Mario - In: European Journal of Operational Research 213 (2011) 1, pp. 73-82
This paper reports on a new solution approach for the well-known multi-mode resource-constrained project scheduling problem (MRCPSP). This problem type aims at the selection of a single activity mode from a set of available modes in order to construct a precedence and a (renewable and...
Persistent link: https://www.econbiz.de/10009018720
Saved in:
A service of the
zbw
  • Sitemap
  • Plain language
  • Accessibility
  • Contact us
  • Imprint
  • Privacy

Loading...