EconBiz - Find Economic Literature
    • Logout
    • Change account settings
  • A-Z
  • Beta
  • About EconBiz
  • News
  • Thesaurus (STW)
  • Academic Skills
  • Help
  •  My account 
    • Logout
    • Change account settings
  • Login
EconBiz - Find Economic Literature
Publications Events
Search options
Advanced Search history
My EconBiz
Favorites Loans Reservations Fines
    You are here:
  • Home
  • Search: subject:"multiple part type"
Narrow search

Narrow search

Year of publication
Subject
All
Assembly-line production 2 CNC 2 Flexible manufacturing systems 2 Fließfertigung 2 Multiple part-type production 2 Robot 2 Roboter 2 Robotic cell 2 Scheduling problem 2 Scheduling-Verfahren 2 Automated manufacturing 1 Automatisierte Produktion 1 Cellular manufacturing 1 Cyclic flow shop 1 Durchlaufzeit 1 Fertigungsinsel 1 Flexible manufacturing system 1 Flexibles Fertigungssystem 1 Ganzzahlige Optimierung 1 Integer programming 1 Lead time 1 Theorie 1 Theory 1 mixed integer programming (MIP) 1 multiple part type 1 multiple robots 1 scheduling 1 single/dual gripper 1
more ... less ...
Online availability
All
Undetermined 2
Type of publication
All
Article 3
Type of publication (narrower categories)
All
Article in journal 2 Aufsatz in Zeitschrift 2
Language
All
English 2 Undetermined 1
Author
All
Akturk, M. Selim 2 Batur, G. Didem 2 Karasan, Oya Ekin 2 Dhananjay Thiruvady 1 Durmusoglu, Alptekin 1 Elmi, Atabak 1 Nazari, Asef 1
more ... less ...
Published in...
All
IEEE transactions on engineering management : EM 1 International Journal of Production Economics 1 International journal of production economics 1
Source
All
ECONIS (ZBW) 2 RePEc 1
Showing 1 - 3 of 3
Cover Image
Cyclic flow shop robotic cell scheduling problem with multiple part types
Elmi, Atabak; Nazari, Asef; Dhananjay Thiruvady; … - In: IEEE transactions on engineering management : EM 69 (2022) 6,1, pp. 3240-3252
Persistent link: https://www.econbiz.de/10013542935
Saved in:
Cover Image
Multiple part-type scheduling in flexible robotic cells
Batur, G. Didem; Karasan, Oya Ekin; Akturk, M. Selim - In: International Journal of Production Economics 135 (2012) 2, pp. 726-740
This paper considers the scheduling problem arising in two-machine manufacturing cells which repeatedly produce a set of multiple part-types, and where transportation of the parts between the machines is performed by a robot. The cycle time of the cell depends on the robot move sequence as well...
Persistent link: https://www.econbiz.de/10010572548
Saved in:
Cover Image
Multiple part-type scheduling in flexible robotic cells
Batur, G. Didem; Karasan, Oya Ekin; Akturk, M. Selim - In: International journal of production economics 135 (2011) 2, pp. 726-740
Persistent link: https://www.econbiz.de/10009490285
Saved in:
A service of the
zbw
  • Sitemap
  • Plain language
  • Accessibility
  • Contact us
  • Imprint
  • Privacy

Loading...