EconBiz - Find Economic Literature
    • Logout
    • Change account settings
  • A-Z
  • Beta
  • About EconBiz
  • News
  • Thesaurus (STW)
  • Academic Skills
  • Help
  •  My account 
    • Logout
    • Change account settings
  • Login
EconBiz - Find Economic Literature
Publications Events
Search options
Advanced Search history
My EconBiz
Favorites Loans Reservations Fines
    You are here:
  • Home
  • Search: subject:"particle accelerators"
Narrow search

Narrow search

Year of publication
Subject
All
particle accelerators 18 ACCELERATORS 9 general and miscellaneous//mathematics, computing, and information science 8 DESIGN 4 FERMILAB ACCELERATOR 4 MANAGEMENT 4 COMPUTER CODES 3 CYCLIC ACCELERATORS 3 SYNCHROTRONS 3 ACCELERATOR FACILITIES 2 BROOKHAVEN RHIC 2 COMPUTER-AIDED DESIGN 2 COST 2 COST ESTIMATION 2 FEEDBACK 2 LINEAR COLLIDERS 2 NEURAL NETWORKS 2 PROCUREMENT 2 QUALITY ASSURANCE 2 SCHEDULES 2 SHOWER COUNTERS 2 SUPERCONDUCTING SUPER COLLIDER 2 instrumentation related to nuclear science and technology 2 AUDITS 1 BEAM INJECTION 1 BEAM OPTICS 1 CAVITIES 1 CEBAF ACCELERATOR 1 CLASSICAL MECHANICS 1 COMMISSIONING 1 COMPUTER ARCHITECTURE 1 COMPUTER NETWORKS 1 COMPUTERIZED CONTROL SYSTEMS 1 COMPUTERIZED SIMULATION 1 CONFIGURATION 1 CONTRACTORS 1 COOLING SYSTEMS 1 COST BENEFIT ANALYSIS 1 CRYOGENICS 1 DATA ACQUISITION 1
more ... less ...
Online availability
All
Free 18
Type of publication
All
Other 18
Language
All
Undetermined 18
Author
All
Bodnarczuk, M. 2 Niederer, J. 2 /Fermilab 1 /Langston U. 1 /Texas U., Arlington 1 Appel, J.A. 1 Avery, P. 1 Boyce, J.R. 1 Chartrand, G. 1 Chester, N.S. 1 Collins, J.P. 1 Cornuelle, John C. 1 Dalesio, L.R. 1 Day, C.T. 1 Fowler, W.B. 1 Gaines, I. 1 Garzoglio, G. 1 Georgiopoulos, C.H. 1 Gilchriese, M.G.D. 1 Glanzman, Thomas 1 Goldman, H. 1 Hanson, E. 1 Harding, D.J. 1 Hoftun, J. 1 Jain, S. 1 Jordan, N.G. 1 Kobliska, G.R. 1 Larsen, R 1 Linglin, D. 1 Livdahl, P.V. 1 Lysenko, W.P. 1 Michael Tiefenback 1 Moore, D.M. 1 Morgan, B. 1 Mottershead, C.T. 1 Nishandar, A. 1 Pewitt, E.G. 1 Prior, S. 1 Ryan Bodenstein 1 Snow, J. 1
more ... less ...
Source
All
BASE 18
Showing 1 - 10 of 18
Cover Image
A conceptual framework for using DOE 5700. 6C and the other DOE orders as an integrated management system; the Fermilab experience
Bodnarczuk, M. - 2009
In this paper, I describe a conceptual framework that uses DOE Order 5700.6C and more than 140 other DOE Orders as an integrated management system -- but I describe it within the context of the broader sociological and cultural issues of doing research at DOE funded facilities. The conceptual...
Persistent link: https://www.econbiz.de/10009435385
Saved in:
Cover Image
Costs to build Fermilab in 1984 dollars
Jordan, N.G.; Livdahl, P.V. - 2009
It is of current interest to examine the costs incurred to date to build Fermi National Accelerator Laboratory and to determine what those costs are when stated in FY 1984 constant dollars. The appended tables are in support of this exercise and are based on all costs for Equipment items...
Persistent link: https://www.econbiz.de/10009435952
Saved in:
Cover Image
PHENIX Work Breakdown Structure. Cost and schedule review copy
2009
The Work Breakdown Structure (WBS) Book begins with this Overview section, which contains the high-level summary cost estimate, the cost profile, and the global construction schedule. The summary cost estimate shows the total US cost and the cost in terms of PHENIX construction funds for...
Persistent link: https://www.econbiz.de/10009436123
Saved in:
Cover Image
PHENIX WBS notes. Cost and schedule review copy
2009
The Work Breakdown Structure (WBS) Book begins with this Overview section, which contains the high-level summary cost estimate, the cost profile, and the global construction schedule. The summary cost estimate shows the total US cost and the cost in terms of PHENIX construction funds for...
Persistent link: https://www.econbiz.de/10009436125
Saved in:
Cover Image
Experience with the Source Evaluation Board method of procuring technical components for the Fermilab Main Injector
Harding, D.J.; Collins, J.P.; Kobliska, G.R.; Chester, N.S. - 2009
Fermilab has adopted the Source Evaluation Board (SEB) method for procuring certain major technical components of the Fermilab Main Injector. The SEB procedure is designed to ensure the efficient and effective expenditure of Government funds at the same time that it optimizes the opportunity for...
Persistent link: https://www.econbiz.de/10009436600
Saved in:
Cover Image
Optics code development at Los Alamos
Mottershead, C.T.; Lysenko, W.P. - 2009
This paper is an overview of part of the beam optics code development effort in the Accelerator Technology Division at Los Alamos National Laboratory. The aim of this effort is to improve our capability to design advanced beam optics systems. The work reported is being carried out by a...
Persistent link: https://www.econbiz.de/10009436653
Saved in:
Cover Image
A development and integration analysis of commercial and in-house control subsystems
Moore, D.M.; Dalesio, L.R. - 2009
The acquisition and integration of commercial automation and control subsystems in physics research is becoming more common. It is presumed these systems present lower risk and less cost. This paper studies four subsystems used in the Accelerator Production of Tritium (APT) Low Energy...
Persistent link: https://www.econbiz.de/10009437067
Saved in:
Cover Image
The design of the MAD Design Program
Niederer, J. - 2008
The study of long term stability in particle accelerators has long been served by a group of widely circulated computer …
Persistent link: https://www.econbiz.de/10009435462
Saved in:
Cover Image
The design of the MAD Design Program
Niederer, J. - 2008
The study of long term stability in particle accelerators has long been served by a group of widely circulated computer …
Persistent link: https://www.econbiz.de/10009435473
Saved in:
Cover Image
Multipass Steering Protocols at Jefferson Lab
Ryan Bodenstein; Michael Tiefenback - 2008
The CEBAF recirculating accelerator consists of two CW superconducting RF linacs, through which an electron beam is accelerated for up to 5 passes. Focusing and steering elements affect each pass differently, requiring a multipass steering protocol to correct the orbits. Perturbations include...
Persistent link: https://www.econbiz.de/10009435649
Saved in:
  • 1
  • 2
  • Next
  • Last
A service of the
zbw
  • Sitemap
  • Plain language
  • Accessibility
  • Contact us
  • Imprint
  • Privacy

Loading...