EconBiz - Find Economic Literature
    • Logout
    • Change account settings
  • A-Z
  • Beta
  • About EconBiz
  • News
  • Thesaurus (STW)
  • Academic Skills
  • Help
  •  My account 
    • Logout
    • Change account settings
  • Login
EconBiz - Find Economic Literature
Publications Events
Search options
Advanced Search history
My EconBiz
Favorites Loans Reservations Fines
    You are here:
  • Home
  • Search: subject:"sequence-dependent set-up"
Narrow search

Narrow search

Year of publication
Subject
All
Scheduling problem 10 Scheduling-Verfahren 10 Durchlaufzeit 9 Lead time 9 Theorie 9 Theory 9 Heuristics 4 Heuristik 4 sequence-dependent set-up times 4 Algorithm 3 Algorithmus 3 Mathematical programming 3 Mathematische Optimierung 3 Simulation 3 scheduling 3 Evolutionary algorithm 2 Evolutionärer Algorithmus 2 Production control 2 Produktionssteuerung 2 makespan 2 sequence-dependent set-up 2 Assembly-line production 1 Auftragsfertigung 1 Branch and Bound 1 Branch-and-Bound 1 Business process management 1 Decomposition algorithm 1 Decomposition method 1 Dekompositionsverfahren 1 Dynamic programming 1 Dynamische Optimierung 1 Fließfertigung 1 Ganzzahlige Optimierung 1 Integer programming 1 Just in Time 1 Just in time 1 Learning process 1 Lernprozess 1 Make-to-order 1 Manufacturing system 1
more ... less ...
Online availability
All
Undetermined 4
Type of publication
All
Article 10
Type of publication (narrower categories)
All
Article in journal 10 Aufsatz in Zeitschrift 10
Language
All
English 10
Author
All
Amirian, Homa 1 Borisovsky, Pavel A. 1 Delorme, Xavier 1 Dolgui, Alexandre 1 Eroglu, Duygu Yilmaz 1 Hamann, Michael 1 Joo, Byung Jun 1 Kayvanfar, Vahid 1 Land, Martin J. 1 Mac Cawley, Alejandro 1 Maturana, Sergio 1 Ozmutlu, H. Cenk 1 Ozmutlu, Seda 1 Pascual, Rodrigo 1 Samarghandi, Hamed 1 Sharaeian, Rashed 1 Silva, Cristovao 1 Stevenson, Mark A. 1 Strohhecker, Jürgen 1 Teymourian, Ehsan 1 Thun, Jörn-Henrik 1 Thürer, Matthias 1 Tortorella, Guilherme Luz 1 Wong, Tak Nam 1 Xirouchakis, Paul 1 Zhang, Sicheng 1
more ... less ...
Published in...
All
International journal of production research 9 European journal of operational research : EJOR 1
Source
All
ECONIS (ZBW) 10
Showing 1 - 10 of 10
Cover Image
Scheduling wine bottling operations with multiple lines and sequence-dependent set-up times : robust formulation and a decomposition solution approach
Mac Cawley, Alejandro; Maturana, Sergio; Pascual, Rodrigo; … - In: European journal of operational research : EJOR 303 (2022) 2, pp. 819-839
Persistent link: https://www.econbiz.de/10013364036
Saved in:
Cover Image
Loading and sequencing heuristics for job scheduling on two unrelated parallel machines with long, sequence-dependent set-up times
Strohhecker, Jürgen; Hamann, Michael; Thun, Jörn-Henrik - In: International journal of production research 54 (2016) 21/22, pp. 6747-6767
Persistent link: https://www.econbiz.de/10011565870
Saved in:
Cover Image
Studying the impact of sequence-dependent set-up times in integrated process planning and scheduling with E-ACO heuristic
Zhang, Sicheng; Wong, Tak Nam - In: International journal of production research 54 (2016) 15/16, pp. 4815-4838
Persistent link: https://www.econbiz.de/10011518980
Saved in:
Cover Image
A production scheduling problem with uncertain sequence-dependent set-up times and random yield
Joo, Byung Jun; Xirouchakis, Paul - In: International journal of production research 53 (2015) 9, pp. 2820-2835
Persistent link: https://www.econbiz.de/10011312239
Saved in:
Cover Image
Studying the effect of server side-constraints on the makespan of the no-wait flow-shop problem with sequence-dependent set-up times
Samarghandi, Hamed - In: International journal of production research 53 (2015) 9, pp. 2652-2673
Persistent link: https://www.econbiz.de/10011312326
Saved in:
Cover Image
Genetic algorithm with local search for the unrelated parallel machine scheduling problem with sequence-dependent set-up times
Eroglu, Duygu Yilmaz; Ozmutlu, H. Cenk; Ozmutlu, Seda - In: International journal of production research 52 (2014) 19, pp. 5841-5856
Persistent link: https://www.econbiz.de/10010424854
Saved in:
Cover Image
Hybrid intelligent water drops algorithm to unrelated parallel machines scheduling problem : a just-in-time approach
Kayvanfar, Vahid; Teymourian, Ehsan - In: International journal of production research 52 (2014) 19, pp. 5857-5879
Persistent link: https://www.econbiz.de/10010425768
Saved in:
Cover Image
Improving the applicability of workload control (WLC) : the influence of sequence-dependent set-up times on workload controlled job shops
Thürer, Matthias; Silva, Cristovao; Stevenson, Mark A.; … - In: International journal of production research 50 (2012) 22, pp. 6419-6430
Persistent link: https://www.econbiz.de/10009673571
Saved in:
Cover Image
Augmented E-constraint method in multi-objective flowshop problem with past sequence set-up times and a modified learning effect
Amirian, Homa; Sharaeian, Rashed - In: International journal of production research 53 (2015) 19, pp. 5962-5976
Persistent link: https://www.econbiz.de/10011421673
Saved in:
Cover Image
Balancing reconfigurable machining lines via a set partitioning model
Borisovsky, Pavel A.; Delorme, Xavier; Dolgui, Alexandre - In: International journal of production research 52 (2014) 13, pp. 4026-4036
Persistent link: https://www.econbiz.de/10010383919
Saved in:
A service of the
zbw
  • Sitemap
  • Plain language
  • Accessibility
  • Contact us
  • Imprint
  • Privacy

Loading...