Showing 1 - 10 of 10,157
Persistent link: https://www.econbiz.de/10012589289
We consider a novel generalization of the resource-constrained project scheduling problem (RCPSP). Unlike many established approaches for the RCPSP that aim to minimize the makespan of the project for given static capacity constraints, we consider the important real-life aspect that capacity...
Persistent link: https://www.econbiz.de/10011942632
This investigation presents a heuristic method for consumable resource allocation problem in multi-class dynamic Project Evaluation and Review Technique (PERT) networks, where new projects from different classes (types) arrive to system according to independent Poisson processes with different...
Persistent link: https://www.econbiz.de/10009783299
Persistent link: https://www.econbiz.de/10014560647
Persistent link: https://www.econbiz.de/10013417099
Persistent link: https://www.econbiz.de/10014517525
In practice, most projects result in cost overruns and schedule slippage due to poor resource management. This paper presents an approach that aims at reducing project duration and costs by empowering project managers to assess different scenarios. The proposed approach addresses combinatorial...
Persistent link: https://www.econbiz.de/10012020090
Purpose: The goal of this article is to provide an extensive literature review of the models and solution procedures proposed by many researchers interested on the Project Scheduling Problem with non-deterministic activities duration. Design/methodology/approach: This paper presents an...
Persistent link: https://www.econbiz.de/10011920873
Persistent link: https://www.econbiz.de/10014564994
Persistent link: https://www.econbiz.de/10014634585