Showing 1 - 10 of 88
Persistent link: https://www.econbiz.de/10011707112
Persistent link: https://www.econbiz.de/10011725419
In this paper, an overview is presented of the existing metaheuristic solution procedures to solve the multi-mode resource-constrained-project scheduling problem, in which multiple execution modes are available for each of the activities of the project. A fair comparison is made between the...
Persistent link: https://www.econbiz.de/10010871299
In this paper we present a genetic algorithm for the multi-mode resource-constrained project scheduling problem (MRCPSP), in which multiple execution modes are available for each of the activities of the project. We also introduce the preemptive extension of the problem which allows activity...
Persistent link: https://www.econbiz.de/10008483332
Persistent link: https://www.econbiz.de/10011439521
Persistent link: https://www.econbiz.de/10011810517
Persistent link: https://www.econbiz.de/10012820140
Persistent link: https://www.econbiz.de/10011475721
Persistent link: https://www.econbiz.de/10011433586
Persistent link: https://www.econbiz.de/10011436765