Showing 1 - 10 of 23
Persistent link: https://www.econbiz.de/10005347731
Persistent link: https://www.econbiz.de/10005152172
Persistent link: https://www.econbiz.de/10005152224
Persistent link: https://www.econbiz.de/10005253597
Persistent link: https://www.econbiz.de/10005277268
This paper focuses on a multiperiod discrete facility location problem where transportation costs are considered together with location costs to design the operating facility pattern along a time horizon. The problem captures the difference in the scope of the location and routing decisions by...
Persistent link: https://www.econbiz.de/10011052413
Persistent link: https://www.econbiz.de/10005755610
In this work, we address the capacitated p-center problem (CpCP). We study two auxiliary problems, discuss their relation to CpCP, and analyze the lower bounds obtained with two different Lagrangean duals based on each of these auxiliary problems. We also compare two different strategies for...
Persistent link: https://www.econbiz.de/10008483209
This paper presents the facility location problem with Bernoulli demands. In this capacitated discrete location stochastic problem the goal is to define an a priori solution for the locations of the facilities and for the allocation of customers to the operating facilities that minimizes the sum...
Persistent link: https://www.econbiz.de/10008869802
In this paper we address the problem of batching orders in a warehouse, with the objective of minimizing the total travel time. Order batching is an NP-hard optimization problem that is very difficult to solve exactly in practice. Thus, most implemented solutions are based on elementary...
Persistent link: https://www.econbiz.de/10008473486