Showing 1 - 10 of 36
We present an exact branch-and-bound algorithm for the two-stage hybrid flow shop problem with multiple identical machines in each stage. The objective is to schedule a set of jobs so as to minimize the makespan. This is the first exact procedure which has been specifically designed for this...
Persistent link: https://www.econbiz.de/10010847763
We present an exact branch-and-bound algorithm for the two-stage hybrid flow shop problem with multiple identical machines in each stage. The objective is to schedule a set of jobs so as to minimize the makespan. This is the first exact procedure which has been specifically designed for this...
Persistent link: https://www.econbiz.de/10010999783
Persistent link: https://www.econbiz.de/10011622151
We investigate the single machine scheduling problem with job release dates and due dates, and multiple planned unavailability time periods. This problem arises in the context of machine scheduling with planned preventive maintenance and might be viewed as a generalisation of several fundamental...
Persistent link: https://www.econbiz.de/10011266509
Persistent link: https://www.econbiz.de/10005109140
Persistent link: https://www.econbiz.de/10005075413
This study investigates an optimization-based heuristic for the robotic cell problem. This problem arises in automated cells and is a complex flow shop problem with a single transportation robot and a blocking constraint. We propose an approximate decomposition algorithm. The proposed approach...
Persistent link: https://www.econbiz.de/10008483128
Persistent link: https://www.econbiz.de/10005312010
Persistent link: https://www.econbiz.de/10005271550
Given a schedule of flights to be flown, the aircraft fleeting and routing problem (AFRP) consists of determining a minimum-cost route assignment for each aircraft so as to cover each flight by exactly one aircraft while satisfying maintenance requirements and other activity constraints. We...
Persistent link: https://www.econbiz.de/10005284151