Showing 1 - 10 of 68
We consider the problem of scheduling multiple projects subject to joint resource constraints. Most approaches proposed in the literature so far are based on the unrealistic assumption that resources can be transferred from one project to the other without any expense in time or cost. In order...
Persistent link: https://www.econbiz.de/10005785942
Most approaches to multi-project scheduling are based on the assumption that resources can be transferred between projects without any expense in time and cost. As this assumption often is not realistic, we generalise the multi-project scheduling problem (RCMPSP) by additionally including...
Persistent link: https://www.econbiz.de/10005785944
We consider the problem of scheduling multiple projects subject to joint resource constraints. Most approaches proposed in the literature so far are based on the unrealistic assumption that resources can be transferred from one project to the other without any expense in time or cost. In order...
Persistent link: https://www.econbiz.de/10005240729
Assembly line balancing problems (ALBP) arise whenever an assembly line is configured, redesigned or adjusted. An ALBP consists of distributing the total workload for manufacturing any unit of the products to be assembled among the work stations along the line subject to a strict or average...
Persistent link: https://www.econbiz.de/10004973584
Nowadays, mixed-model assembly lines are applied in a wide range of industries to mass-produce customized products to order, e.g., in automobile industry. An important decision problem in this context receiving a lot of attention from researchers and practitioners is the sequencing problem,...
Persistent link: https://www.econbiz.de/10010871103
This paper deals with the generalized resource-constrained project scheduling problem (GRCPSP) which extends the well-known resource-constrained project scheduling problem (RCPSP) by considering job specific release and due dates, non-negative minimum start-to-start time lags as well as...
Persistent link: https://www.econbiz.de/10010847827
Persistent link: https://www.econbiz.de/10010949931
This paper deals with the generalized resource-constrained project scheduling problem (GRCPSP) which extends the well-known resource-constrained project scheduling problem (RCPSP) by considering job specific release and due dates, non-negative minimum start-to-start time lags as well as...
Persistent link: https://www.econbiz.de/10010950224
Assembly line balancing problems (ALBP) consist in assigning the total workload for manufacturing a product to stations of an assembly line as typically applied in automotive industry. The assignment of tasks to stations is due to restrictions which can be expressed in a precedence graph....
Persistent link: https://www.econbiz.de/10010574195
Persistent link: https://www.econbiz.de/10005109143