Showing 1 - 10 of 15
Persistent link: https://www.econbiz.de/10012091822
Persistent link: https://www.econbiz.de/10012145274
Persistent link: https://www.econbiz.de/10014451389
Persistent link: https://www.econbiz.de/10005283469
This paper considers the uncapacitated lot sizing problem with batch delivery, focusing on the general case of time-dependent batch sizes. We study the complexity of the problem, depending on the other cost parameters, namely the setup cost, the fixed cost per batch, the unit procurement cost...
Persistent link: https://www.econbiz.de/10010666116
This paper introduces new environmental constraints, namely carbon emission constraints, in multi-sourcing lot-sizing problems. These constraints aim at limiting the carbon emission per unit of product supplied with different modes. A mode corresponds to the combination of a production facility...
Persistent link: https://www.econbiz.de/10010608506
Persistent link: https://www.econbiz.de/10013326823
Persistent link: https://www.econbiz.de/10011448525
Persistent link: https://www.econbiz.de/10011412446
Persistent link: https://www.econbiz.de/10011900441