Showing 1 - 10 of 45
Persistent link: https://www.econbiz.de/10014446359
This paper presents a contingent valuation study concerning landscape impacts generated by the construction of one dam (Baker 1) of the HIDROAYSEN hydropower project located in the Chilean Patagonia. A survey was used to collect information about citizens’ opinions towards the hydropower...
Persistent link: https://www.econbiz.de/10010997362
Persistent link: https://www.econbiz.de/10011948547
Persistent link: https://www.econbiz.de/10011718025
Persistent link: https://www.econbiz.de/10011745455
Persistent link: https://www.econbiz.de/10011684365
Persistent link: https://www.econbiz.de/10012195850
Persistent link: https://www.econbiz.de/10013410858
Persistent link: https://www.econbiz.de/10012694545
Persistent link: https://www.econbiz.de/10012313041