Showing 1 - 10 of 74
This paper is concerned with the study of the constant due-date assignment policy in repetitive projects, where the activity durations are exponentially distributed random variables. It is then extended to the case where activity durations follow generalized Erlang distributions. The main...
Persistent link: https://www.econbiz.de/10008869643
Persistent link: https://www.econbiz.de/10005151770
Persistent link: https://www.econbiz.de/10012537729
This paper develops a polynomial algorithm for obtaining dynamic economic lot sizes in a single product multiperiod production system with the objective of minimizing total production and inventory costs over T periods. It is assumed that production costs are linear, inventory costs are concave,...
Persistent link: https://www.econbiz.de/10005066828
Persistent link: https://www.econbiz.de/10005337847
Persistent link: https://www.econbiz.de/10005347866
Persistent link: https://www.econbiz.de/10005277562
Persistent link: https://www.econbiz.de/10005278084
Persistent link: https://www.econbiz.de/10005283416
Persistent link: https://www.econbiz.de/10005283430