Showing 1 - 10 of 15
Persistent link: https://www.econbiz.de/10013410775
This paper proposes an iterated greedy algorithm for solving the blocking flowshop scheduling problem for makespan minimization. Moreover, it presents an improved NEH-based heuristic, which is used as the initial solution procedure for the iterated greedy algorithm. The effectiveness of both...
Persistent link: https://www.econbiz.de/10008869824
Persistent link: https://www.econbiz.de/10005095023
Persistent link: https://www.econbiz.de/10005598327
Persistent link: https://www.econbiz.de/10005287455
Persistent link: https://www.econbiz.de/10011887551
The two experimental methods most commonly used for reducing the effect of noise factors on a response of interest Y aim either to estimate a model of the variability (V(Y), or an associated function), that is transmitted by the noise factors, or to estimate a model of the ratio between the...
Persistent link: https://www.econbiz.de/10005495278
This article studies and evaluates how five well-known statistical packages-JMP, Minitab, SigmaXL, Statgraphics, and Statistica-address the problem of analyzing the significance of effects in unreplicated factorial designs. All five use different methods and criteria that deliver different...
Persistent link: https://www.econbiz.de/10011104192
Water management has become a vital concern for both water supply companies and public administrations due to the importance of water for life and current scarcity in many areas. Studies exist that attempt to explain which factors influence water demand. In general, these studies are based on a...
Persistent link: https://www.econbiz.de/10010997384
The aim of this project is to assign domestic water consumption to different devices based on the information provided by the water meter. We monitored a sample of Barcelona and Murcia with flow switches that recorded when a particular device was in use. In addition, the water meter readings...
Persistent link: https://www.econbiz.de/10010997539