Showing 1 - 10 of 42
A network needs to be constructed by a server (construction crew) that has a constant construction speed which is incomparably slower than the server’s travel speed within the already constructed part of the network. A vertex is recovered when it becomes connected to the depot by an already...
Persistent link: https://www.econbiz.de/10011264292
Persistent link: https://www.econbiz.de/10011948069
Persistent link: https://www.econbiz.de/10012439881
Persistent link: https://www.econbiz.de/10011429001
Persistent link: https://www.econbiz.de/10011445324
Persistent link: https://www.econbiz.de/10011901396
Persistent link: https://www.econbiz.de/10011814863
Persistent link: https://www.econbiz.de/10013266080
In this article, we present a new exact algorithm for solving the simple assembly line balancing problem given a determined cycle time (SALBP-1). The algorithm is a station-oriented bidirectional branch-and-bound procedure based on a new enumeration strategy that explores the feasible solutions...
Persistent link: https://www.econbiz.de/10011052608
The simple assembly line balancing problem is the simplification of a real problem associated to the assignment of the elementary tasks required for assembly of a product in an assembly line. This problem has been extensively studied in the literature for more than half a century. The present...
Persistent link: https://www.econbiz.de/10005283527