We study the scheduling of projects subject to general temporal constraints between activities such that the project net present value is maximized. The proposed algorithm is based on a first-order steepest ascent approach, where the steepest ascent directions are normalized by the supremum...
Persistent link: https://www.econbiz.de/10010847874
We study the scheduling of projects subject to general temporal constraints between activities such that the project net present value is maximized. The proposed algorithm is based on a first-order steepest ascent approach, where the steepest ascent directions are normalized by the supremum...
Persistent link: https://www.econbiz.de/10010999876
We consider a generalization of the classical resource constrained project scheduling problem. We introduce so-called partially renewable resources by assuming for each resource a capacity on subsets of periods. The concept of partially renewable resources is a fundamental tool in order to make,...
Persistent link: https://www.econbiz.de/10009191542
We consider the resource-constrained project scheduling problem. The purpose of this paper is to direct the focus to a branch-and-bound concept that can, by simple adaptations, operate on a wide range of problem settings. The general approach can, e.g., deal with multimode problems, resource...
Persistent link: https://www.econbiz.de/10009197319
Management of projects is complicated by the scarcity of resources required to execute them. Limited resources usually extend the project completion times beyond those determined by CPM/PERT. Several solution procedures have been developed for solving the resource constrained project scheduling...
Persistent link: https://www.econbiz.de/10009214245
Resource-constrained project scheduling with generalised precedence constraints is a very general scheduling model with applications in areas such as make-to-order production planning. We describe a time-oriented branch-and-bound algorithm that uses constraint-propagation techniques which...
Persistent link: https://www.econbiz.de/10009214375
In project scheduling, a set of precedence-constrained jobs has to be scheduled so as to minimize a given objective. In resource-constrained project scheduling, the jobs additionally compete for scarce resources. Due to its universality, the latter problem has a variety of applications in...