Showing 1 - 10 of 27
We consider two linear project time–cost tradeoff problems with multiple milestones. Unless a milestone is completed on time, penalty costs for tardiness may be imposed. However, these penalty costs can be avoided by compressing the processing times of certain jobs that require additional...
Persistent link: https://www.econbiz.de/10010753489
We consider a two-machine flow shop problem in which each job is processed through an in-house system or outsourced to a subcontractor. A schedule is established for the in-house jobs, and performance is measured by the makespan. Jobs processed by subcontractors require paying an outsourcing...
Persistent link: https://www.econbiz.de/10009018750
Persistent link: https://www.econbiz.de/10011483034
Persistent link: https://www.econbiz.de/10012200371
Persistent link: https://www.econbiz.de/10012300194
Persistent link: https://www.econbiz.de/10012493966
Persistent link: https://www.econbiz.de/10012544877
Persistent link: https://www.econbiz.de/10012813246
Persistent link: https://www.econbiz.de/10013473154
Persistent link: https://www.econbiz.de/10014516561