This paper examines a resource constrained production planning and scheduling problem motivated by the coal supply chain. In this problem, multiple independent producers are connected with a resource availability (or, linking) constraint. A general description of such problems is provided,...
Persistent link: https://ebvufind01.dmz1.zbw.eu/10011097779
Persistent link: https://ebvufind01.dmz1.zbw.eu/10011491464
Persistent link: https://ebvufind01.dmz1.zbw.eu/10005417745
Persistent link: https://ebvufind01.dmz1.zbw.eu/10012239623
Persistent link: https://ebvufind01.dmz1.zbw.eu/10012130467
The paper presents a priority algorithm for the maximum lateness problem with parallel identical processors, precedence constraints, and preemptions. The presented algorithm calculates the priority of each task by constructing a schedule for the set of its successors. The algorithm is motivated...
Persistent link: https://ebvufind01.dmz1.zbw.eu/10005080655
Persistent link: https://ebvufind01.dmz1.zbw.eu/10005257250
We consider a scheduling problem arising in the mining industry. Ore from several mining sites must be transferred to ports to be loaded on ships in a timely manner. In doing so, several constraints must be met which involve transporting the ore and deadlines. These deadlines are two-fold: there...
Persistent link: https://ebvufind01.dmz1.zbw.eu/10010594416
The Hunter Valley Coal Chain is the largest coal export operation in the world with a throughput in excess of 100 million tonnes per annum (Mtpa). Coal is delivered to the shipping terminal from 40 mines using 27 coal load points spread across the Hunter Valley region. This paper describes an...
Persistent link: https://ebvufind01.dmz1.zbw.eu/10010597600
Persistent link: https://ebvufind01.dmz1.zbw.eu/10011947960