Showing 1 - 10 of 111
In this paper we introduce an extension of the well known Rural Postman Problem, which combines arc routing with profits and facility location. Profitable arcs must be selected, facilities located at both end-points of the selected arcs, and a tour identified so as to maximize the difference...
Persistent link: https://www.econbiz.de/10011097829
Persistent link: https://www.econbiz.de/10011428997
Persistent link: https://www.econbiz.de/10011490979
Persistent link: https://www.econbiz.de/10011508929
Persistent link: https://www.econbiz.de/10011864425
Persistent link: https://www.econbiz.de/10011886709
Persistent link: https://www.econbiz.de/10011743336
Persistent link: https://www.econbiz.de/10011758639
Persistent link: https://www.econbiz.de/10011577908
Persistent link: https://www.econbiz.de/10011813080