Showing 1 - 10 of 37
Persistent link: https://www.econbiz.de/10012254032
This paper deals with irreducible augmentation vectors associated with three combinatorial optimization problems: the TSP, the ATSP, and the SOP. We study families of irreducible vectors of exponential size, derived from alternating cycles, where optimizing a linear function over each of these...
Persistent link: https://www.econbiz.de/10010999803
This paper deals with irreducible augmentation vectors associated with three combinatorial optimization problems: the TSP, the ATSP, and the SOP. We study families of irreducible vectors of exponential size, derived from alternating cycles, where optimizing a linear function over each of these...
Persistent link: https://www.econbiz.de/10010759395
Persistent link: https://www.econbiz.de/10011864350
Persistent link: https://www.econbiz.de/10011882780
Persistent link: https://www.econbiz.de/10011732089
Persistent link: https://www.econbiz.de/10012238920
Persistent link: https://www.econbiz.de/10004995460
The paper presents a priority algorithm for the maximum lateness problem with parallel identical processors, precedence constraints, and preemptions. The presented algorithm calculates the priority of each task by constructing a schedule for the set of its successors. The algorithm is motivated...
Persistent link: https://www.econbiz.de/10005080655
This paper studies a two-machine flow shop scheduling problem with a supporting precedence relation. The model originates from a real production context of a chemical factory that produces foam-rubber products. We extend the traditional two-machine flow shop by dividing the operations into two...
Persistent link: https://www.econbiz.de/10010594390