Showing 1 - 6 of 6
Persistent link: https://www.econbiz.de/10009761517
This paper describes a real-world case study consisting in redesigning the inter-facility network of a parcel distribution company in a developing country. The primary objective of the paper is to identify and indeed convey the existing technical, organisational and cultural challenges. As it...
Persistent link: https://www.econbiz.de/10010816545
A formulation of the network design problem as a bilevel linear program is presented which admits both the convex and concave investment functions. It also allows a more general representation of travel cost functions than a previous formulation by LeBlanc and Boyce (1986).
Persistent link: https://www.econbiz.de/10005279804
In this paper we propose a model to generate an effective timetable for time definite parcel distribution companies operating a hierarchical hub-and-spoke network. The model, referred to as parcel distribution timetabling problem, provides the departure times from each serviced city and each...
Persistent link: https://www.econbiz.de/10009892787
In this paper we propose a model to generate an effective timetable for time definite parcel distribution companies operating a hierarchical hub-and-spoke network. The model, referred to as parcel distribution timetabling problem, provides the departure times from each serviced city and each...
Persistent link: https://www.econbiz.de/10009425786
Persistent link: https://www.econbiz.de/10011415149