Showing 1 - 10 of 16
This paper is devoted to the calculation of the stability radius of an optimal schedule for a job shop problem, when the objective is to minimize mean or maximum flow times. The approach used may be regarded as an a posteriori analysis, in which an optimal schedule has already been constructed...
Persistent link: https://www.econbiz.de/10005336354
Persistent link: https://www.econbiz.de/10005257120
Persistent link: https://www.econbiz.de/10009281533
Persistent link: https://www.econbiz.de/10011543366
Persistent link: https://www.econbiz.de/10011497244
Persistent link: https://www.econbiz.de/10011491440
Persistent link: https://www.econbiz.de/10011997083
Persistent link: https://www.econbiz.de/10011825549
Persistent link: https://www.econbiz.de/10012265203
Persistent link: https://www.econbiz.de/10012064992