Showing 1 - 10 of 63
Persistent link: https://www.econbiz.de/10011448564
Persistent link: https://www.econbiz.de/10014230736
Persistent link: https://www.econbiz.de/10012589253
Persistent link: https://www.econbiz.de/10014547343
Persistent link: https://www.econbiz.de/10015053716
Persistent link: https://www.econbiz.de/10014381425
The lot-streaming flow shop scheduling problem plays an important role in modern industry. This paper addresses this problem with the objective of minimizing the total weighted earliness and tardiness penalties and then proposes a simple but effective iterated local search (ILS) algorithm. In...
Persistent link: https://www.econbiz.de/10011099482
Process planning and scheduling are two of the most important functions in the manufacturing system. Traditionally, process planning and scheduling were regarded as separate tasks performed sequentially, where scheduling was implemented after process plans had been generated. However, their...
Persistent link: https://www.econbiz.de/10008869661
Persistent link: https://www.econbiz.de/10015095408
Persistent link: https://www.econbiz.de/10015324755