Showing 1 - 10 of 57
The logic of Manufacturing Resource Planning (MRP II) is usually implemented in production planning and control systems and therefore has a major impact on the performance of many real production systems. Much of what practitioners complain about, i.e. long lead times, high work-in-process, and...
Persistent link: https://www.econbiz.de/10013521523
The discrete lotsizing and scheduling problem for one machine with sequence-dependent setup times and setup costs is solved as a single machine scheduling problem, which we term the batch sequencing problem. The relationship between the lotsizing problem and the batch sequencing problem is...
Persistent link: https://www.econbiz.de/10009197449
The logic of Manufacturing Resource Planning (MRP II) which is implemented in most modern production planning and control systems does not provide any satisfying solutions for multi-level lot sizing, especially not, when capacity is scare. Moreover, lot size and sequence decisions are usually...
Persistent link: https://www.econbiz.de/10013519422
Persistent link: https://www.econbiz.de/10011544962
Persistent link: https://www.econbiz.de/10011439802
Persistent link: https://www.econbiz.de/10011412476
Persistent link: https://www.econbiz.de/10011866881
Persistent link: https://www.econbiz.de/10011868226
Persistent link: https://www.econbiz.de/10011695439
Persistent link: https://www.econbiz.de/10011717185