Showing 1 - 10 of 16
Purpose – The purpose of this paper is to provide Lean Six Sigma deployment champions with a structured approach to identify and prioritize parts of their business that are conducive to the Lean Six Sigma methodology. Design/methodology/approach – A five‐step approach to Lean Six Sigma...
Persistent link: https://www.econbiz.de/10014782551
The last 20 years have seen significant advances in the use of statistical methodology in industry, with applications in new product design and development, optimization and control of manufacturing processes, and in the service industries. The field of industrial statistics has emerged as an...
Persistent link: https://www.econbiz.de/10005141282
Purpose – This paper aims to present a quality and business improvement framework based on Six Sigma/design, measure, analyze, improve, and control (DMAIC); design for Six Sigma (DFSS); and Lean principles. An historical perspective on these methods is also provided....
Persistent link: https://www.econbiz.de/10014782504
Persistent link: https://www.econbiz.de/10005414432
This paper introduces a one-sided multivariate exponentially weighted moving average (MEWMA) chart for detecting an increase in a process mean. The control limits are based on the multivariate Poisson distribution and have applications for both industrial processes and public health data. The...
Persistent link: https://www.econbiz.de/10010741435
Persistent link: https://www.econbiz.de/10005118296
Persistent link: https://www.econbiz.de/10005130669
Persistent link: https://www.econbiz.de/10005130798
Erratum To "Economic Design of Fraction Defective Control Charts" By Montgomery, Heikes and Mance, Management Sci. 21 (11, July) (1975).
Persistent link: https://www.econbiz.de/10009189513
An expected cost model for the fraction defective control chart for the case where there are several out-of-control states is developed. A procedure is presented for determining the sample size, control limit or critical region, and interval between samples which minimizes the expected cost of...
Persistent link: https://www.econbiz.de/10009191312