Showing 1 - 10 of 10
Persistent link: https://www.econbiz.de/10015210879
Purpose The purpose is to investigate how to create a new premium new energy vehicle brand. Design/methodology/approach This study employed a two-stage design. Firstly, a single-case study of NIO was undertaken to execute a thematic analysis, from which propositions were proposed and a...
Persistent link: https://www.econbiz.de/10015340861
In order to meet greenhouse gas emissions targets the Great Britain (GB) future electricity supply will include a higher fraction of non-dispatchable generation, increasing opportunities for demand side management to maintain a supply/demand balance. This paper examines the extent of flexible...
Persistent link: https://www.econbiz.de/10011116068
The growing share of electricity generation from renewable energy creates difficulties in maintaining the balance of generation and demand. This is mainly due to uncertainties caused by prediction errors in renewable generation. In order to maintain power system security, the participation of...
Persistent link: https://www.econbiz.de/10011116094
Noise in the form of random errors in implementing a choice is a common problem in real-world interactions. Recent research has identified three approaches to coping with noise: adding generosity to a reciprocating strategy; adding contrition to a reciprocating strategy; and using an entirely...
Persistent link: https://www.econbiz.de/10010812738
An approach for minimisation of the capital costs and energy consumption in a district heating network is presented using a case study based on a district heating network in South Wales, UK. A number of different design cases were simulated using the PSS SINCAL, taking into account different...
Persistent link: https://www.econbiz.de/10011053430
A Spatial–Temporal model (STM) was developed to evaluate the impact of large scale deployment of plug-in electric vehicles (EVs) on urban distribution networks. The STM runs based on the integration of power system analysis and transportation analysis. Origin–Destination (OD) analysis from...
Persistent link: https://www.econbiz.de/10011041192
Wind power is expected to be the major element of renewable electricity generation in Great Britain (GB) by 2020 with a capacity of around 30 GW. The potential impact of a large amount of wind generation on the GB gas network was investigated using a combined gas and electricity network...
Persistent link: https://www.econbiz.de/10008863329
A Monte Carlo model of the combined GB gas and electricity network was developed to determine the reliability of the energy infrastructure. The model integrates the gas and electricity network into a single sequential Monte Carlo simulation. The model minimises the combined costs of the gas and...
Persistent link: https://www.econbiz.de/10010709257
A combined gas and electricity network expansion planning model was developed. Gas-fired generation plants were considered as linkages between the two networks. The model simultaneously minimises gas and electricity operational and network expansion costs. Additionally it optimally places...
Persistent link: https://www.econbiz.de/10010718841