Showing 1 - 10 of 14
Considers the resource‐constrained project scheduling problem where cash inflows and outflows are tied to the occurrence of events. The objective is the maximization of the project net present value (NPV) as well as the minimization of project tardiness in the presence of a project due date....
Persistent link: https://www.econbiz.de/10014794198
We propose a constructive heuristic that generates roadside debris cleanup plans for a limited number of equipment in the post-disaster road recovery planning problem. Travel times between cleanup tasks are not pre-fixed but depend on the blockage status of the entire road network at the time of...
Persistent link: https://www.econbiz.de/10011118026
We present a survey that focuses on the response and recovery planning phases of the disaster lifecycle. Related mathematical models developed in this area of research are classified in terms of vehicle/network representation structures and their functionality. The relationships between these...
Persistent link: https://www.econbiz.de/10011209335
We describe a hierarchical cluster and route procedure (HOGCR) for coordinating vehicle routing in large-scale post-disaster distribution and evacuation activities. The HOGCR is a multi-level clustering algorithm that groups demand nodes into smaller clusters at each planning level, enabling the...
Persistent link: https://www.econbiz.de/10011049007
We propose a Population based dual-sequence Non-Penalty Annealing algorithm (PNPA) for solving the general nonlinear constrained optimization problem. The PNPA maintains a population of solutions that are intermixed by crossover to supply a new starting solution for simulated annealing...
Persistent link: https://www.econbiz.de/10008455600
Reports on a benchmarking study conducted to quantify how well companies operating in various sectors of Turkish industry match up to best practice, both in the practices they adopt and in the operational outcomes that result, and to test the hypothesis that the closer a company is to best...
Persistent link: https://www.econbiz.de/10014789531
A problem of risk mitigation in project scheduling is formulated as a bi-objective optimization problem, where the expected makespan and the expected total cost are both to be minimized. The expected total cost is the sum of four cost components: overhead cost, activity execution cost, cost of...
Persistent link: https://www.econbiz.de/10005414196
This paper introduces a multi-project problem environment which involves multiple projects with assigned due dates; activities that have alternative resource usage modes; a resource dedication policy that does not allow sharing of resources among projects throughout the planning horizon; and a...
Persistent link: https://www.econbiz.de/10011097731
The capability of firms to survive and to have a competitive advantage in global markets depends on, amongst other things, the efficiency of public institutions, the excellence of educational, health and communications infrastructures, as well as on the political and economic stability of their...
Persistent link: https://www.econbiz.de/10005367458
Persistent link: https://www.econbiz.de/10011551091