Showing 1 - 10 of 35
The projects introduction in organization triggers many human resources problems both at project and organization level. Those issues varies depending on contengency factors.
Persistent link: https://www.econbiz.de/10010905135
Several formulations to the mixed-model assembly line have been proposed in the literature. Such a problem is concerned with the production of a variety of product models. Vehicles fall into that category. The underlying assumptions of those models are often restrictive, therefore limiting their...
Persistent link: https://www.econbiz.de/10010707131
Persistent link: https://www.econbiz.de/10010707802
The standardization of partially substitutable components destined to meet a set of needs is studied. The monocriterion approach to standardization proposed in the last century is highlighted by taking into account several criteria and an economic valorization through modeling by linear...
Persistent link: https://www.econbiz.de/10010861367
The synchronization of the production of a manufacturing supplier, who makes alternate components assembled on his industrial customer’s work station with this client’s production specialized in mass production of highly diversified products, must take into account the improvement of their...
Persistent link: https://www.econbiz.de/10010905309
This article focuses on the calculation of the optimal stock-out risk when resorting to emergency supplies is allowed. The studied context is a supply chain where several distant mixed-model assembly lines trigger the demand of a component used for assembly. When the cumulated lead time of a...
Persistent link: https://www.econbiz.de/10011273989
This paper examines the centralised monitoring of an upstream supply chain (USC) in the context of a mass customisation production system. We propose an adaptation of the material requirement planning framework to manage demand uncertainty at each stage of the USC. New analytical relations that...
Persistent link: https://www.econbiz.de/10011246074
In an upstream supply chain dedicated to the mass production of customized products, many sources create production instability: the level and structure of production in the final assembly line, variability of lead times, quality issues, packaging and loading constraints on transportation,...
Persistent link: https://www.econbiz.de/10010706874
In an upstream supply chain (USC) dedicated to the mass production of customized products, decentralized management is possible and performing in the steady state, if all the links that precede the final assembly line use periodic replenishment policies. These policies require appropriate safety...
Persistent link: https://www.econbiz.de/10010706971
The transition from synchronous supplies to synchronous production represent a possible alternative to the neighbourhood logistics configurations, especially in the automotive industry. It allows to gain, on certain conditions, efficiency and more manoeuvrability faced with a strong variability...
Persistent link: https://www.econbiz.de/10010707281