Showing 1 - 10 of 42
engineering education, the government has already embarked on several reforms within the current legislative framework. Given this … dynamic momentum, the engineering education sector in India is expected to receive a significant boost over the next few years … to help in measuring the performance of the current engineering education system in India. The government also recognizes …
Persistent link: https://www.econbiz.de/10012560528
This report aims to review Latin America and Caribbean (LC2) projects both in preparation and implementation phases to identify key entry points to address Violence Against Women and Girls (VAWG). This review sought to identify VAWG prevention and response actions beyond Sexual Exploitation and...
Persistent link: https://www.econbiz.de/10014579690
This Toolkit is aimed at practitioners, bi-lateral and multi-lateral organizations, and community and non-governmental organizations involved in land projects, programs and activities. It draws from secondary research and applies experience to provide a pathway to the successful integration of...
Persistent link: https://www.econbiz.de/10014579833
Persistent link: https://www.econbiz.de/10011393530
This NSUP Universal Accessibility cost benefit analysis pilots is part of the Universal Accessibility Toolkit developed under the project. It performs a economic assessment of two pilot sub-investments of the project, making a case for the quantitative benefits of early inclusion of UA versus...
Persistent link: https://www.econbiz.de/10014578862
The Advisory Services and Analytics (ASA) Mitigating Gender-Based Violence Risks and Expanding the gender-based violence (GBV) portfolio in Central America carried out in FY21 aimed to develop and apply a methodology to screen World Bank (WB) projects across sectors to identify entry points for...
Persistent link: https://www.econbiz.de/10014578910
This note summarizes lessons and practices deployed in embedding climate resilience into the design of projects that received catalytic funds from The Africa Climate Resilience Investment Facility (AFRI-RES). It draws from application of the Resilience Booster Tool to specific projects, as...
Persistent link: https://www.econbiz.de/10014579081
The objective of this assignment was to develop a Monitoring and Evaluation (M&E) system for watershed management in the Loess Plateau area. The M&E system for the China Watershed Management Project (CWMP) has been developed on the base of the M&E system that has been implemented during the...
Persistent link: https://www.econbiz.de/10012553370
The development plan of the Federal Government of Ethiopia emphasized low-cost energy supply as a prerequisite to the enhancement of industrial and economic development for the period 1984-1993. Current power planning studies have estimated Ethiopia's hydropower potential at 30,000 MW, which...
Persistent link: https://www.econbiz.de/10012554959
The Livestock Sector Rehabilitation Project, operational from 1986 through 1995, was seen as essential in facilitating the new government's implementation of its economic strategy when it came to office in 1984. Previous government policy had required that 10 percent of all herds be sold at a...
Persistent link: https://www.econbiz.de/10012554988