Showing 1 - 10 of 45
In Thailand, enhancing workforce skills and promoting innovation is part of the country's strategy to facilitate the transformation toward a more knowledge-intensive and creative economy generating good jobs. This report provides valuable insight for Thailand to develop the skills necessary to...
Persistent link: https://www.econbiz.de/10012550530
mitigation strategy that is included in a project's social risk assessment. In some cases, activities that will support …
Persistent link: https://www.econbiz.de/10014579690
project stages: (1) scoping, (2) design, (3) implementation, and (4) evaluation; but with an emphasis on scoping and design …
Persistent link: https://www.econbiz.de/10014579833
Persistent link: https://www.econbiz.de/10011393530
under the project. It performs a economic assessment of two pilot sub-investments of the project, making a case for the …
Persistent link: https://www.econbiz.de/10014578862
The Advisory Services and Analytics (ASA) Mitigating Gender-Based Violence Risks and Expanding the gender-based violence (GBV) portfolio in Central America carried out in FY21 aimed to develop and apply a methodology to screen World Bank (WB) projects across sectors to identify entry points for...
Persistent link: https://www.econbiz.de/10014578910
This note summarizes lessons and practices deployed in embedding climate resilience into the design of projects that received catalytic funds from The Africa Climate Resilience Investment Facility (AFRI-RES). It draws from application of the Resilience Booster Tool to specific projects, as...
Persistent link: https://www.econbiz.de/10014579081
the Loess Plateau area. The M&E system for the China Watershed Management Project (CWMP) has been developed on the base of … the M&E system that has been implemented during the previous two phases of the World Bank Loess Plateau Project. The final …
Persistent link: https://www.econbiz.de/10012553370
The development plan of the Federal Government of Ethiopia emphasized low-cost energy supply as a prerequisite to the enhancement of industrial and economic development for the period 1984-1993. Current power planning studies have estimated Ethiopia's hydropower potential at 30,000 MW, which...
Persistent link: https://www.econbiz.de/10012554959
The Livestock Sector Rehabilitation Project, operational from 1986 through 1995, was seen as essential in facilitating …
Persistent link: https://www.econbiz.de/10012554988