Showing 1 - 10 of 11
For shipbuilding, spatial scheduling and workforce assignment are two important issues for the operation management in block assembly shops. Spatial scheduling is to decide where and when to assemble blocks, while workforce assignment is to assign working teams to the blocks. Traditionally, they...
Persistent link: https://www.econbiz.de/10010748328
Scheduling with learning effects has received lots of research attention lately. However, the multiple-agent setting with learning consideration is relatively limited. On the other hand, the actual processing time of a job under an uncontrolled learning effect will drop to zero precipitously as...
Persistent link: https://www.econbiz.de/10011099486
Bus network design is an important problem in public transportation. In practice, some parameters of this problem are uncertain. We propose two models for the bus terminal location problem with fuzzy parameters. In the first formulation, the number of passengers corresponding to each node is a...
Persistent link: https://www.econbiz.de/10010540982
A single-machine two-agent scheduling problem with a truncation learning effect is being addressed in the study. The truncation learning effect means that the actual processing time of a job is a function of the sum of processing times of already scheduled jobs and a control parameter. The aim...
Persistent link: https://www.econbiz.de/10010540984
An unpredictable breakdown often occurs and tends to complicate production scheduling in a steelmaking-continuous casting (SCC) plant. Because of particular characteristics and technology constraints of the SCC plant, traditional robust scheduling often provides an excessively conservative...
Persistent link: https://www.econbiz.de/10011278973
Scheduling track lines at a marshalling station where the objective is to determine the maximal weighted number of trains on the track lines can be modeled as an interval scheduling problem: each job has a fixed starting and finishing time and can only be carried out by an arbitrarily given...
Persistent link: https://www.econbiz.de/10008455281
This paper presents a combined framework of Multi-Objective Generic Algorithm (MOGA) and Monte Carlo Simulation (MCS) in order to improve backbone topology by leveraging the Virtual Link (VL) system in an hierarchical Link-State (LS) routing domain. Given that the sound backbone topology...
Persistent link: https://www.econbiz.de/10005047171
To optimize the design of reliability systems, an analyst is frequently faced with the demand of achieving several targets (i.e., maximization of system reliability, minimizations of cost, volume, and weight), some of which may be in conflict with each other. This paper presents a novel hybrid...
Persistent link: https://www.econbiz.de/10005050667
This paper considers two/three-machine no-wait flow shop scheduling problems with makespan minimization. Inherited with the NP-hard problem nature, this scheduling problem is solved by using a Simulated Annealing (SA) and Genetic Algorithm (GA) instead of mathematical programming. These two...
Persistent link: https://www.econbiz.de/10005050688
This paper addresses the multi-period two-echelon integrated competitive/uncompetitive facility location problem in a distribution system design that involves locating regional distribution centers (RDCs) and stores, and determining the best strategy for distributing the commodities from a...
Persistent link: https://www.econbiz.de/10005050692