The significance of whole-life costs for building operation and maintenance (O&M) is well known. The causes of ill-budgeted O&M resources, however, are often uncertain. An in-depth exploration of the problems with budgeting O&M works for commercial buildings in Hong Kong was carried out, based...
Persistent link: https://www.econbiz.de/10008674563
A survey was undertaken of the losses or costs incurred in building contracts because of accidents on building sites. Altogether, 576 accidents from 18 building sites were investigated. On each site, an accident occurrence index (AOI) was calculated by dividing the total equivalent day loss by...
Persistent link: https://www.econbiz.de/10009277641
In statistical analysis of intertemporal movements in time-cost relationships via the Bromilow model it is shown that … a new and simpler ratio measure of the time-cost relationship, which has the advantage of being obtainable for each …
Persistent link: https://www.econbiz.de/10009277647
The preparation of cost estimates for construction projects is not an easy job, because construction projects are … available. However, the cost estimates prepared at this stage are usually the most important to the client. Nowadays, the costs … for building services installations contribute a significant share of the total construction cost of building projects …
Persistent link: https://www.econbiz.de/10009277913
. Nevertheless, these savings do not always justify their construction cost premiums. The study showed that more research was needed …
Persistent link: https://www.econbiz.de/10009194459
variables for actual construction time, such as increase in project cost and delay in procurement of construction materials. The … effect of local political unrest on construction time was statistically significant even in the presence of project cost and …
Persistent link: https://www.econbiz.de/10008466645
non-linear integer programming form is proposed for selection of concrete anchors in order to minimize connection cost. It …
Persistent link: https://www.econbiz.de/10005482660
Timely completion and high performance are becoming key factors in modern road projects, so research is needed to have reliable contracts and acceptance criteria. The goal of this paper is confined to the formalization and validation of a unique model for the determination of pay adjustment on...
Persistent link: https://www.econbiz.de/10005482692
The assessment process of productivity and cost of bored pile construction is dictated by unseen subsurface obstacles … equipment productivity and cost. Current research discusses the assessment of piling process productivity and cost using the … and cost. The developed models are validated whereas 79% of the outputs have been predicted with more than 75% accuracy …
Persistent link: https://www.econbiz.de/10005268978
The concept of project duration is important in assessing the success or viability of a construction project. A time-cost … relationship for construction projects in Nigeria has been developed based on Bromilow's time-cost model. Cost data on 87 completed … double log and later the piecewise model with breakpoint. For the Nigerian situation, the Bromilow's time-cost model was …
Persistent link: https://www.econbiz.de/10005633182